CYSALYS

For a tower company in the West of France. Temporary installation of an SHP-Unit while waiting for the an electricity network’s extension. Gained 6 months of operations. Average electric consumption of 2.5 kW. Fuel savings reached 47% and maintenance savings reached 73 %.

CYSALYS

Coverage of the high-speed train line between Paris and the West of France. Electric consumption 500W. Fuel savings of 95 % and maintenance savings of 90 % thanks to the use of an SHP-Unit.

CYSALYS

Tower company in the North of France. Temporary installation of an SHP-Unit while waiting for the electricity network. Consumption of 2300 Wh. Fuel savings of 54 % and maintenance savings of 70%.

CYSALYS

Tower company in the South of France. Installation of an SHP-Unit while waiting for the arrival of the electricity network. Installation is completed within 4 hours on production site.

CYSALYS

Tower company in the West of France. Temporary installation for the coverage of a high-speed train line . Consumption of 2.3 kWh. Fuel savings of 50 % and maintenance savings of 78 % with an SHP-Unit.

CYSALYS

Tower company in the West of France. Coverage of a high-speed train line. Average electric consumption of 1.2 kWh. Fuel savings of 85 % and maintenance savings of 93 %.

CYSALYS

Overseas mobile phone company. Permanent installation of an SHP-Unit to avoid waiting for an extension of public energy network which could be very long and expensive. Average Electric consumption of 3.5 KW. Fuel savings of 58 % and maintenance savings of 70 %.

CYSALYS

Autonomous overseas station. 100 % of availability for a private radio network.

CYSALYS

IoT telephone company in the east of France. Temporary pilot installation supplying electricity for a Gateway IoT. Electric consumption of 50 Wh.